Categories
Knitting

Opera Muffatees

 

I made these quick muffatees from some leftover Wendy Guernsey yarn in shade 590 Crimson.  The stunning red reminds me of the heroines in my favourite operas, Tosca and Carmen.  Here’s the pattern for anyone who wants to use up a little leftover guernsey yarn – they would work in DK, too – but you might need to do a bit of due diligence re. the tension.

Opera Muffatees

You Need:   1 ball Wendy’s 5 Guernsey yarn. (or leftovers from a guernsey project).
Or:
Use 100g 1 ball DK. (245 yards, 224 metres).

1 ball will probably make two pairs, so you may get a pair from leftovers.

2.5mm dpn or circular needles, or needles right size to get tension

Size: Average woman’s (Palm = 18cm, wrist = 17cm). NB There is a fair bit of negative ease – this stitch pattern is stretchy, so make smaller than you need. I had 1cm negative ease in my sample. If you need to add some sts to make larger, work a margin of sts in stocking stitch centrally placed below and above the thumb, so as to keep pattern repeats complete, horizontally. Or for even more stretch, work this panel of stitches in moss st.

Tension: Cast on 38 sts in pattern give glove with 17cm palm – 1cm of negative ease.
Or: 10cm = 22sts in pattern

 

Cuff
Using longtail or any stretchy but firm method, cast on 38 sts. Join in round without twisting. Place Marker at start of round.
Rds 1 -3: *(P1, K1), rep to end round
Rd 4: Purl
Rds 5 – 12 : Rep from *, three times (ie: til you have 4 bands of purls and 4 bands of ribbing).

K 1, P1 round.

Main Part of Glove
Establish Pattern
All subsequent rounds: Follow chart, starting with round 1. Motif is multiple of 12. At end of rnd, you will have 2 extra sts. PM before the first of these. Work these 2 sts in stocking st when you hit them. You will place your thumb here, shortly.

Work 5 rounds. 2 sts from end of round 6; continue to work according to chart, whilst making thumb gusset:

 

Thumb Gusset
Establish thumb gusset above your 2 plain stocking sts. When you hit first of these 2 sts: PM, K1, M 1purlwise, K1. Work in pattern to end round.
Rnd 7: Work according to chart. When you hit marker, K1, P1, K1
Rnd 8: This time when you hit marker, K1, P1, Mk 1 knitwise, M1 purlwise, K1
Rnd 9: Wok round hand in patt acc to chart. When you hit marker: K1, P1, K1, P1, K1.

Now continue to work acc to chart, and inc two sts knitwise, immediately inside the 2 purl sts, every other round til you have 15 thumb sts. (ie: You are increasing every even numbered round). [55sts when thumb gusset is complete, including the 2 P sts].
When you have 55 sts, work one more round then leave all thumb sts including the 2 P sts on waste yarn or st holder.

Rejoin in round and work in K1 P1 ribbing. K last 2 sts of rnd (the single K sts, one from each side of the thumb) together [37sts].
Cont working in ribbing, and moss st that final st – K one rnd, P it the next.
Work for 2cm or longer if preferred.

Cast off in ribbing.

Complete Thumb
Using smaller needles, PU 17 sts waiting for you.
M 2 sts from body of mitt. [19sts]
On next rnd, K2tog, work to end of rnd in K1 P1 ribbing [18 sts]
Cont in K1, P1 rib for 4 rounds. Cast off.

Sew in all ends. Make second mitt as above.

Opera Muffatees Chart

Click above for PDF

 

 

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.